Automating product development, from collection to product page.

Briefs, tech packs, samples, costs, approvals, product pages: the product department circulates the same information between the studio, purchasing, suppliers and sales. Every move from one file to another is re-keying, and a source of errors.

Updated

The department

Who does what in the department.

One team, distinct roles. Those with their own page are linked.

Product managementcollections, R&D or engineering
  • Product manager range, pricing, calendar
  • Product development studio, formulation, engineering
  • Quality and compliance tests, standards, controls
  • Regulatory affairs dossiers, claims, labelling

The relays : Purchasing, suppliers and contract manufacturers, marketing and sales, who wait for the product page to sell.

The ecosystem

What the department receives, and what it passes on.

Dotted flows are those where information is most often re-keyed by hand.

It receives

  • Brief and collection planmanagement, merchandising
  • Supplier prices and lead timespurchasing, suppliers
  • Sample and test feedbackstudio, laboratory, factory
  • Quality and regulatory requirementsquality, standards
  • Past seasons’ salessales, reporting
Product and developmentPLM · materials library

It passes on

  • Tech packs and bills of materialsto suppliers and production
  • Cost pricesto finance and pricing
  • Product pagesto marketing and e-commerce
  • Order requirementsto purchasing and supply chain
  • Compliance dossiersto quality and the authorities

flow that worksflow often re-keyed

Across the department

What gets automated.

Not an isolated task, but the circuits that run through the department every month.

  • An up-to-date collection plan

    One source, one status per reference, visible to the studio, purchasing and management, with no spreadsheet to consolidate.

  • Tech packs and bills of materials

    Generated from the PLM, versioned, sent to the right supplier in the right format.

  • The cost price

    Recalculated with every change of material, supplier or quantity, with the planned margin alongside.

  • Samples and approvals

    An approval circuit, automatic reminders, a table of delays per supplier.

  • The product page for sales

    Attributes, composition and descriptions prepared from the tech pack, drafted by AI then reviewed.

  • Collection reporting

    Progress, delays and planned margins for management, up to date with no intermediate file.

What stays human

  • Design and collection choices.
  • Trade-offs between cost, quality and lead time.
  • Approving samples and the relationship with suppliers.
Use cases

How to automate, case by case.

Each case starts from a question leadership teams ask. The starting point, what gets automated, the tools involved, and what stays in the teams’ hands.

  1. How do you automate a collection’s critical path?

    Today
    Product management sets a launch date, then each team works the milestones backwards in its own spreadsheet: brief, sketches, prototypes, sample approval, orders, production, delivery. When a milestone slips, nobody recalculates what follows, and the delay is discovered at ordering time.
    What gets automated
    The critical path is built once per product type, with the standard lead times of each step and each supplier. The tool recalculates it in cascade as soon as a milestone moves in the PLM, flags the styles that threaten the launch date and warns the owners of the following steps. Management sees the real progress of the collection, style by style.
    What stays human
    The choice to move a date, drop a style from the collection or pay for an acceleration remains with product management.
    • PLM
    • Planning tool
    • Messaging
    • Reporting tool (BI)

    Is this case yours? Book a meeting →

  2. How do you automate the collection plan?

    Today
    The collection plan lives in a shared spreadsheet: families, number of styles, variants, target prices, statuses. The studio, purchasing and sales each keep their own copy, and the version approved in committee is never quite the one used for development.
    What gets automated
    The plan becomes a view of the PLM or of a custom tool: each line is a style with its status, target price, planned margin and variants. Changes are logged and visible to all, deviations from the approved plan are flagged (style added, variant removed, target price exceeded) and the plan feeds the critical path and the order requirements directly.
    What stays human
    The structure of the collection, the number of styles and the trade-offs between families remain decisions for product management and merchandising.
    • PLM
    • Custom tool
    • Reporting tool (BI)

    Is this case yours? Book a meeting →

  3. How do you automate item creation in the ERP from the PLM?

    Today
    Once the style is approved, someone recreates it by hand in the ERP: item code, size and colour variants, EAN codes, bill of materials, supplier, purchase price, customs code. Entry errors show up later, at goods receipt or invoicing.
    What gets automated
    Approving the style in the PLM triggers item creation in the ERP according to coding rules set once. Variants, EAN codes and purchasing data are generated or carried over automatically, and missing fields block the transfer with an alert to the right person. Every later change in the PLM is passed on with its history.
    What stays human
    The coding rules and the approval of the items created remain with the product team and the master data managers.
    • PLM
    • ERP
    • Integration connector

    Is this case yours? Book a meeting →

  4. How do you automate feeding the PIM and the e-commerce site from the PLM?

    Today
    Composition, care, dimensions, origin, colourways: e-commerce and marketing ask the product team again for information that already exists in the tech packs. It is copied into the PIM, often late, and sometimes differs from what was produced.
    What gets automated
    The attributes needed for selling are mapped once in the PLM and sent automatically to the PIM at each approval, with technical values translated into customer-facing labels. An AI agent drafts a first description from these attributes, in the brand’s tone. Differences between the tech pack and the online product page are flagged.
    What stays human
    Proofreading descriptions and commercial claims remains with marketing and product.
    • PLM
    • PIM
    • E-commerce site
    • AI writing agent

    Is this case yours? Book a meeting →

  5. How do you automate the management of a materials and components library?

    Today
    The materials, trims and components in use are scattered across tech packs, swatch binders and supplier files. The studio recreates materials that already exist, and nobody knows which styles use a component when its supplier changes.
    What gets automated
    A single library holds each material with its characteristics, suppliers, prices, lead times, certificates and test results. Tech packs draw from it instead of copying, and price lists or certificates sent by suppliers are read by an AI agent then matched to the right material. The tool shows in one click every style concerned by a material.
    What stays human
    Listing a new material and deciding to replace one remain decisions for product development and purchasing.
    • PLM
    • Materials library
    • AI document-reading agent
    • Supplier portal

    Is this case yours? Book a meeting →

  6. How do you automate the compilation of product compliance files?

    Today
    Before going to market, each style needs its supplier declarations, test reports, restricted-substance certificates and marking elements. The documents arrive by e-mail, in varied formats, and the file is put together in a rush when a customer or an authority asks for it.
    What gets automated
    The list of expected documents is set by product family and by market. The tool requests them automatically from suppliers as soon as the style is approved, reads the documents received with an AI agent, checks validity dates and declared substances, then files the dossier against the style. Incomplete files are visible before the launch date.
    What stays human
    The decision to place a product on the market and responses to the authorities remain the responsibility of quality and regulatory affairs.
    • PLM
    • Supplier portal
    • AI document-reading agent
    • Document management

    Is this case yours? Book a meeting →

  7. How do you automate a product’s end of life?

    Today
    When a style is discontinued, the decision travels by e-mail: the ERP keeps suggesting replenishments, the site keeps it online, purchasing still has materials on order and after-sales does not know how long spare parts will last. Each department discovers the discontinuation in turn.
    What gets automated
    The discontinuation is declared once, in the PLM, with a date and a reason. The tool derives each department’s actions: block replenishment in the ERP, list stock and open orders, list materials to run down, schedule removal from the site and inform after-sales. Tracking shows what remains to be done until the style is closed.
    What stays human
    The decision to discontinue, what happens to the remaining stock and the exit date remain decided by product management with sales.
    • PLM
    • ERP
    • E-commerce site
    • Task tracking tool

    Is this case yours? Book a meeting →

  8. How do you automate tracking a collection’s planned margin?

    Today
    Management control asks for the collection’s planned margin, and the product team rebuilds it from each style’s cost price, the target selling prices and the plan quantities. The figures change with every supplier quote and the consolidation is always one version behind.
    What gets automated
    Cost prices, target prices and planned quantities are read continuously from the PLM and the collection plan. The tool consolidates the margin by family, supplier and channel, compares it with the budget and flags the styles that erode it. Product management and finance look at the same view.
    What stays human
    The trade-offs to hold the margin (changing material, supplier or price, or removing a style) remain decided by product management and finance.
    • PLM
    • Collection plan
    • Reporting tool (BI)

    Is this case yours? Book a meeting →

  9. How do you automate passing a collection’s order requirements to purchasing?

    Today
    Once the collection is approved, the product team sends purchasing a spreadsheet of quantities by style, colourway and size, to which purchasing adds the requirements for materials and trims. Last-minute changes mean resending the file, and material orders sometimes go out on an outdated version.
    What gets automated
    The quantities approved in the collection plan are multiplied by the PLM bills of materials to calculate the requirements for materials, trims and finished goods. Order proposals are sent to the ERP or the purchasing portal, and each change of quantity or bill of materials updates the requirements, flagging orders already placed.
    What stays human
    Placing orders, negotiated minimums and supplier choice remain the business of purchasing.
    • PLM
    • ERP
    • Purchasing portal

    Is this case yours? Book a meeting →

  10. How do you automate document exchanges with suppliers and contract manufacturers?

    Today
    Tech packs, sample comments, photos, quotes and certificates are exchanged by e-mail and instant messaging. Versions cross, the supplier sometimes works from an old sheet, and finding out who approved what means digging through mailboxes.
    What gets automated
    A supplier portal linked to the PLM becomes the only channel: the supplier finds the latest version of each document there, uploads quotes, photos and certificates, and answers comments style by style. Uploads are matched automatically to the right style, and reminders go out on their own when a reply is late.
    What stays human
    The relationship with suppliers, negotiation and sample approval remain led by the product team.
    • Supplier portal
    • PLM
    • Messaging

    Is this case yours? Book a meeting →

  11. How do you automate feeding quality and after-sales defects back to product development?

    Today
    Defects found in quality control, customer returns and after-sales complaints are recorded in different tools. Product development hears about them anecdotally, and the same defect turns up in the next collection.
    What gets automated
    Returns from after-sales, customer service and quality control are linked automatically to the style and its materials. An AI agent reads the comments and classifies defects by type (stitching, material, clasp, sizing, formula, packaging), then the tool flags to development the styles and components that keep coming back. The history can be consulted when developing a similar product.
    What stays human
    Root-cause analysis and the changes to make to the product remain decided by development and quality.
    • After-sales software
    • Quality tool
    • PLM
    • AI classification agent

    Is this case yours? Book a meeting →

  12. How do you automate searching the history of past product developments?

    Today
    For a new product, the team looks for whether a material has already been tested, which supplier produced a given finish, or why a prototype was rejected. The information exists, in the PLM, in reports and e-mails, but only the memory of the longest-serving staff can find it.
    What gets automated
    Tech packs, sample reports, test reports and comments are indexed. An AI agent answers questions in plain language (“which lining has already been approved for this type of bag?”) citing the source documents and the styles concerned. PLM access rights are respected.
    What stays human
    The team checks the cited sources and decides whether to reuse a past solution.
    • PLM
    • Document management
    • AI search agent

    Is this case yours? Book a meeting →

Depending on your sector

The same principles, different rules.

Your system

PLM at the centre, connected to the rest.

When a PLM exists, it remains the department’s tool. Automation connects it to purchasing, the ERP, the e-commerce site and reporting, and handles what it does not do. When there is none, a custom tool can play that role, sized to the team.

Frequent questions

What leadership teams ask.

A question not answered here? Book a meeting →

How do you automate product development?
By making the PLM, or a custom tool, the single source for each reference, then automating what comes out of it: tech packs to suppliers, costs to finance, product pages to sales.
Do you need a PLM to automate collection development?
Not always. An off-the-shelf PLM suits processes close to its standards; otherwise a lighter custom tool can be enough. The diagnostic compares both on your real circuits.
How do you produce tech packs without filling them in by hand?
By generating them from the reference data (materials, measurements, bill of materials) rather than filling them in by hand, with a version for every change and direct sending to the supplier.
How do you calculate a product’s cost price automatically?
By linking the bill of materials to supplier prices, landed costs and quantities: cost and margin are recalculated with every change, with no intermediate spreadsheet.
What happens when a style is approved in the PLM?
It automatically creates the item in the ERP and prepares the site’s product page: each piece of information is entered once.
Can AI write product pages?
Yes, from the tech pack and the brand’s rules, with a human review before publishing. It is one of the department’s quickest wins.
How do you track a collection’s progress in real time?
With a dashboard fed by the PLM and supplier exchanges: status of each reference, delays, planned margins, with no file to consolidate.
How long does it take to implement a PLM?
It depends on the number of references, the tools in place and the approval circuits; the diagnostic puts a figure on it. Projects usually start on a narrow scope, one line or one season, before extending.
02 — Getting started

Describe what’s holding your teams back.

A first conversation to qualify your need. Then a scoped diagnostic: the scope, the solution, the estimate.

Discuss your project

Reply within 48 business hours.